Linemen install new power infrastructure in downtown Victoria. (Tom Fletcher/Black Press)

B.C. Hydro’s $5.5 billion in deferred debt puts pressure on rates

Auditor General says 29 accounts a complicated system

B.C. Hydro customers will have to pay off $5.5 billion in operating debt that has been pushed into the future to keep rates from spiking, and it’s not yet clear how the NDP government is going to tackle that.

Energy Minister Michelle Mungall’s initial effort to freeze rates was blocked by regulators, requiring a 3.5 per cent increase in 2017. Last year’s increase was another three per cent, similar to what the B.C. Liberal government had scheduled in its 10-year rate plan.

RELATED: B.C. Hydro freeze refused, rates go up 3% for 2018

RELATED: NDP looks for ways to rein in B.C. Hydro rates

In June of 2018, Mungall announced separate reviews of Hydro’s capital and operating debt, with outside experts to find a way forward, after the NDP government reluctantly decided to complete the $10 billion Site C project.

A key goal for Mungall is to return rate-setting to the B.C. Utilities Commission, after a series of directives from the previous government that drew accusations of political interference to make B.C. Hydro’s financial picture look better than it is.

On Wednesday, B.C. Auditor General Carol Bellringer released the latest report on B.C. Hydro’s deferred operating debt, which is separate from the billions in capital debt racked up for project such as Site C on the Peace River, the John Hart Dam reconstruction on Vancouver Island and the Ruskin dam and powerhouse rebuild in the Fraser Valley.

Deferring the bills of major storms and other unexpected spikes in operating costs is normal practice for utilities, Bellringer says. But B.C. Hydro’s network of 29 accounts is unusually complicated, with “rate smoothing” effects on future rates unclear.

In their response to Bellringer’s report, the ministry and B.C. Hydro emphasize that current customer rates are already on track to pay off 25 of the 29 deferral accounts.

Three that are not are the “customer crisis fund” account, the “Site C regulatory account” and the “rate smoothing regulatory account.”


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

Just Posted

Expect delays on Highway 1 west of Golden due to vehicle fire

Expect delays while driving Highway 1 between Golden and Revelstoke. Drive BC… Continue reading

Source of Turtle Creek contamination identified

Revelstoke Mountain Resort made the repairs immediately

Highways, weather, avalanche conditons for Revelstoke area today

Information for if you plan to head outside today

Alleged robbery turned kidnapping prompted Kelowna police presence

RCMP allege it was a targeted crime believed to be linked to the drug trade

VIDEO: Canada’s flag turns 54 today

The maple leaf design by George Stanley made its first appearance Feb. 15, 1965

Eight cases of measles confirmed in Vancouver outbreak

Coastal Health official say the cases stem from the French-language Ecole Jules Verne Secondary

Semi loses control on Highway 97A in Shuswap

Slippery roads contribute to crash of transport truck carrying tires

Plecas won’t run in next election if B.C. legislature oversight reforms pass

B.C. Speaker and Abbotsford South MLA says he feels ‘great sympathy’ for Jody Wilson-Raybould

Infighting at Kelowna Yacht Club makes it to court

Marc Whittemore, a local lawyer and prominent member of the club, filed a notice of civil claim Feb. 1

Workshop with ‘accent reduction’ training cancelled at UBC

The workshop was cancelled the same day as an email was sent out to international students

Former B.C. premier Gordon Campbell accused of sexual touching

Accuser went to police, interviewed by Britian’s Daily Telegraph

Syrian refugee responds to racism in Canada

Guest columnist Mustafa Zaqrit

Most Read