Phase four of the Kicking Horse Canyon project will twin the winding stretch of the Trans-Canada Highway just east of Golden, B.C. (Photo Ministry of Transportation Photo)

Phase four of the Kicking Horse Canyon project will twin the winding stretch of the Trans-Canada Highway just east of Golden, B.C. (Photo Ministry of Transportation Photo)

‘Definitely Revelstoke will take a financial hit’: Highway 1 upgrades near Golden to begin this fall

The province said there will be no extended 24 hour closures during summer or winter

The province held an information session in Revelstoke last month about the upcoming highway expansion project east of Golden.

The fourth and most difficult phase of Kicking Horse Canyon Project is scheduled to begin this fall. Construction is expected to cost $601 million and estimated to be complete by the winter of 2023/24.

“This is an extremely complex project,” said Art McClean, operations manager from the Ministry of Transportation.

“We’re redesigning a 1950s highway.”

Map of the Kicking Horse Canyon project. (Province of B.C.)

When Phase 4 was first introduced in 2016, the price tag was $450 million.

The province said the 34 per cent price increase is due to additional engineering, design and geotechnical work, additional foundation supports for bridges and retaining calls, consultation with Indigenous communities and the Community Benefits Agreement (CBA).

Hiring under CBS includes provisions for hiring local workers, Indigenous Peoples, apprentices and women in trades. The application of CBA will cost $35 million, roughly six per cent of the project’s total budget.

READ MORE: Kicking Horse widening budget up $151 million as bidders invited

READ MORE: B.C. Highway 1 widening to Alberta demanded for decades

Phase 4 involves redesigning and expanding a 4.8 km section of highway, just outside Golden. Currently, the highway in this area is wedged next to crumbling cliffs and frequently susceptible to rockfall and avalanches. There are also multiple tight corners.

The province states Kicking Horse Canyon sees collision rates three times higher than the provincial average for similar two-lane highways.

The improvements include turning the two-lane highway into four lanes, straightening 13 sharp curves, adding a 2.5 metre shoulder, improving catchment for avalanches, as well as adding retaining walls and median barriers to reduce collisions.

The province is aiming to reduce collisions by 66 per cent and increase the posted speed limit from 80 km/h to 100 km/h.

Various types of closures are expected, such as delays of up to 20 minutes, scheduled closures less than two hours, overnight closures up to 10 hours and extended 24-hour closures.

The province said there will be no 24-hour closures during the summer or winter, only in April, May, September, October and November. No daytime closures are expected during summer months.

The extended 24-hour closures should be posted three months in advance on DriveBC. Traffic will be diverted to Highway 93 and Highway 95, adding an extra 100 kilometres to the drive from Calgary to Golden.

Revelstoke mayor Gary Sulz said he is concerned about the project’s impact on Revelstoke, in particular on tourism from Calgarians with the added drive time.

“Definitely Revelstoke will take a financial hit,” said Sulz.

He wonders if at the intersection of Highway 93 and 95, drivers will instead turn left and go to closer destinations such as Invermere or take the longer road and turn right to Golden and Revelstoke.

“Only time will tell which direction people will turn.”

McClean said the project will be difficult due to avalanche and rockfall hazards to road crew. He said the Rocky mountains are not a strong mountain range.

“They tend to fall down.”

Below the highway is the railway, McClean said the work cannot interrupt rail traffic. Nor the Kicking Horse River.

McClean continued that the contractor will be held to their proposed closure times.

“If they say two hours, it better be two hours,” he said.

If it’s longer, McClean said there could be financial penalties.

In 2003, the Kicking Horse Canyon Project was launched to improve 26 km of highway between Golden and Yoho National Park. The province said all four phases will cost $927 million, with the Government of Canada providing $350 million and B.C. covering the rest. Each summer, roughly 12,000 vehicles travel this section of highway daily.


 

@pointypeak701
liam.harrap@revelstokereview.com

Like us on Facebook and follow us on Twitter.

ConstructionTransCanada

Get local stories you won't find anywhere else right to your inbox.
Sign up here

 

Map of the Kicking Horse Canyon project. (Province of B.C.)

Map of the Kicking Horse Canyon project. (Province of B.C.)

Just Posted

Before the pandemic, Rebecca Martin said she felt like the world was her oyster, but in the spring of 2020 the oyster snapped shut. According to Revelstoke’s Well-being survey results, the pandemic has been particularly hard on young people. (Contributed)
I ❤️ Revy: ‘Any sense of future and freedom I had was lost’

Revelstoke survey says youth age 18-25 were most impacted by COVID-19 restrictions

File
Court awards $150K to car crash victim near Revelstoke

The incident occurred in 2015 during a snowstorm on Highway 1

(Pixabay photo)
Morning Start: Kentucky has more bourbon than people

Your morning start for Thursday, May 6, 2021

A woman wears a face mask and shield to curb the spread of COVID-19 while walking in North Vancouver, B.C., on Wednesday, January 6, 2021. THE CANADIAN PRESS/Darryl Dyck
57 new cases of COVID-19 in Interior Health region

Thirty people in the region are in hospital, 16 of whom are in intensive care

Protesters attempt to stop clear-cutting of old-growth trees in Fairy Creek near Port Renfrew. (Will O���Connell photo)
VIDEO: Workers, activists clash at site of Vancouver Island logging operation

Forest license holders asking for independent investigation into incident

B.C. average home price and sales level to 2023, showing steep drop in sales expected next year. (Central 1)
Forecast calls for B.C. home sales to ‘explode,’ then drop off

Average price to rise another 10% in 2021, credit unions say

Central Okanagan recorded 174 cases throughout the week of April 25 to May 1. (BCCDC/Contributed)
Weekly COVID-19 numbers continue to decrease in Central Okanagan

The Central Okanagan had 174 cases from April 25 to May 1

Join Black Press Media and Do Some Good
Join Black Press Media and Do Some Good

Pay it Forward program supports local businesses in their community giving

RCMP did not commit offense in arrest which seriously injured Lake Country man, finds IIO. (Phil McLachlan/Capital News/Stock)
Vernon police didn’t use excessive force in domestic takedown: Watchdog

‘One stepped on him and one had his knee in his neck,’ woman told IIO

Salmon Arm Silverbacks forward Sullivan Mack gets a boost into West Kelowna goalie Johnny Derrick from Warriors forward Tyson Jugnauth during West Kelowna’s 5-4 B.C. Hockey League pod play win Wednesday, May 5, at Vernon’s Kal Tire Place. (Tami Quan Photography)
West Kelowna Warriors hold on to edge Silverbacks

Warriors up three with five minutes to go, give up two late goals but end up with 5-4 BCHL win over Salmon Arm

A fifth wheel fire came dangerously close to a Lake Country home Wednesday afternoon. (Lake Country Fire Department photo)
RCMP, neighbours save Okanagan house from fire

Fifth wheel up in flames next to home

Members of Vancouver Symphony Orchestra. (File photo)
B.C.-wide #DayOfMusic to feature 100-plus free virtual concerts May 15

‘Our colleagues across the province have figured out new ways to perform and connect,’ VSO boss says

Two passengers were recently fined thousands of dollars after they faked their pre-flight COVID-19 test results. (Paul Clarke/Black Press)
2 passengers in Canada fined thousands for faking pre-flight COVID-19 tests

The government issued a warning Thursday to others thinking of doing the same – do it and you’ll be ordered to pay

Most Read