BRIDGE BUILDING In 1913, crews installed the girders as they constructed the railway bridge over Trout Creek Canyon. The bridge is still in use today. (Photo courtesy of the Summerland Museum)

Historic railway bridge receiving upgrade work

Maintenance at Kettle Valley Steam Railway bridge in Summerland to be finished by end of year

Crews are at work on Summerland’s historic railway bridge over Trout Creek Canyon.

The construction work means the bridge is now closed to pedestrians as crews are doing repairs to the structure.

Gerry Conrad, secretary of the Kettle Valley Railway Society, said the work is normal midlife maintenance for the bridge.

It includes removing the deck, replacing the timbers underneath and repairing the deck surface and replacing some of the metal support work at the end closest to Summerland.

“This is all to keep the bridge in operation for another decade and a half or two decades,” he said.

The work began at the beginning of December and Conrad said crews are expected to have it completed before the end of the year.

He said the estimated cost is a couple of hundred thousand dollars.

The bridge repair work will not affect the Kettle Valley Steam Railway’s annual Christmas Express Trains. Those trains, which run Dec. 13 to 17 and 20 to 23, do not stop on the trestle. Instead, they stop at the siding nearby.

The bridge and the steam train are parts of transportation history in Summerland and the Okanagan Valley.

The bridge across Trout Creek Canyon was constructed in 1913 and the first train crossed it on Oct. 25, 1913. It is 73 metres above the canyon floor.

The first train passed through Summerland on May 31, 1915. The last passenger train was on Jan. 16, 1964.

Since the late 1990s, the Kettle Valley Steam Railway has operated a tourist train on a 16-kilometre section of track. This is the only preserved section of the historic railway.

To report a typo, email:
news@summerlandreview.com
.



news@summerlandreview.com

Like us on Facebook and follow us on Twitter.

 

SPANNING A CANYON In order to bring train service to Summerland in the early 20th century, a bridge was required across Trout Creek Canyon. The bridge is 73 metres above the canyon floor. (Photo courtesy of the Summerland Museum)

Just Posted

Glimpses of Revelstoke’s past for May 22

120 Years Ago: Revelstoke Herald, May 20, 1899 Great improvements had been… Continue reading

Another climate rally scheduled for Friday in Revelstoke

Join students at City Hall to call for climate action

Roads and weather for Revelstoke today

No new fires in the Southeast Fire Centre

Revelstoke Community Calendar for May 22

Downhill Fiver Series May 26, 10 a.m. Get stoked for the 2019… Continue reading

Okanagan-Shuswap weather: rain, clouds, thunderstorms and flash floods

Environment Canada forecasts dreadful weather for Thursday

600 new campsites coming to provincial parks and recreation sites across B.C.

Tourism Minister announced half of the new spots to 13 most popular provincial parks

Raptors beat Bucks 105-99 to move within 1 game of NBA Finals

Leonard scores 35 as Toronto takes 3-2 series lead over Milwaukee

Okanagan housing builds hope for 52 homeless individuals

The 52 unit supported housing apartment officially opens in Vernon

Gardens plant hope for Okanagan residents who were once homeless

Turning Points, in collaberation with Briteland, bring square foot gardening to Blair Apartments

Okanagan hockey icon heads to B.C. hall

Vernon’s Ken Holland, GM of the Edmonton Oilers, inducted into B.C. Sports Hall of Fame Thursday

Municipalities protest after B.C. declares marijuana crops ‘farm use’

UBCM president seeks answers in letter to John Horgan government

RCMP set to patrol Okanagan lakes

Vernon-North Okanagan members will be on area waters helping keep boaters safe

Popular Peachland park reopens

Hardy Falls Regional Park has been closed from flood damage since 2017

Summerland students to raise voices in public speech competition

Public speaking component is included in high school English program

Most Read