Province to meet with BC Hydro over pricing, billing

Officials will discuss potential changes to deferred debt, past price increases and two-tier billing early in the new year.

The premier of B.C. says his government will be meeting with BC Hydro officials in the new year to discuss a number of issues including deferred debt, the steady increase in electricity pricing and also the much maligned two-tier billing process.

Speaking to reporters this week, John Horgan acknowledged a “host of issues” at BC Hydro and levelled his criticism at the former governing Liberals who he says had left the crown corporation “far from under control”.

“I’m committed to making sure that I’m protecting rate-payers from rate shock, which we’ve seen. Over the past decade our rates have been going up far faster than the cost of inflation; far faster than other jurisdictions.”

RELATED: Election 2017 – What’s up with hydro rates?

RELATED: John Horgan appoints new BC Hydro chair

With snow already falling in many parts of the province, Horgan said he remains critical of how the BC Liberals introduced the two-tiered pricing program, even encouraging residents to get rid of their wood stoves and converting to electric heat — those same residents who are now seeing their rates go through the roof.

“I don’t think the two-tiered system takes into consideration the diversity of family units in B.C. and I think if you want to use it as a demand management technique, to reduce peoples use of electricity, that’s a good thing,” Horgan continued.

“But if the consequence is that every month everyone’s paying more, everyone’s going past that first tier, then I think we need to take a look at it.”

Site C dam

Holding firm on his election commitment to make a decision on Site C by the end of 2017, the B.C. Utilities Commission released its independent report on Wednesday, finding that the final cost “may” exceed $10 billion.

Horgan’s government instructed BCUC to come up with cost estimates for completing the dam, pausing construction for a more thorough review of alternatives and future electricity demand, or stopping it and restoring the project area.

The report estimates the cost of shutting down Site C and remediating the project area to be $1.8 billion, plus the cost of finding alternative energy sources to meet demand, on top of the $2 billion already spent. Choosing to suspend construction would add at least $3.6 billion to the final cost according to the report.

FROM THE VAULT: BC Hydro rates going up 28 per cent over five years

RELATED: BC Hydro applies to raise rates by four per cent

Just Posted

Revelstoke elementary students cast votes in mock election

Begbie View and Arrow Heights Elementary took part in the vote

InVertigo playing The Last Drop Friday night

Rock’n’roll band once again coming to Revelstoke

Kootenay-Columbia candidate cautious after getting threats

Trev Miller of the Animal Protection Party carries on campaigning under shadow of threats, abusive emails

YouTube video of Revelstoke grizzly bear goes viral

Why did the grizzly bear cross the railway tracks?

Federal candidates talk most pressing issues in Revelstoke

Concerns include jobs, logging, climate change, affordable housing, Highway 1

Scheer, Trudeau, Singh haggle over potential minority government outcome

If you believe the polls, it appears the Liberals and Conservatives are neck-and-neck

Canucks beat Stanley Cup champs 4-3 in a shootout

Leivo nets winner, Vancouver dumps St. Louis for fourth straight win

‘The more you test, the more you find’: Beef recalls a sign of success, experts say

Despite appearances, experts say a recent rise in major recalls is not a sign of food supply problems

One year later: Vernon pot stores look back at legalization

Edibles made legal on first anniversary of recreational cannabis

Memorial remembers North Okanagan’s most marginalized

Prayers and flowers for those who have died on the streets

Two years later, City of Fernie remembers

Oct. 17, 2019 marks two years since the tragic ammonia leak at Fernie Memorial Arena

Japanese buyer expands wood pellet contract with B.C.’s Pinnacle

Mitsui and Co. increases contract with Interior energy producer

Great Vernon Pumpkin Race to star in South Korean documentary

Pumpkin Classic event to kick off this weekend with gourd weigh-ins

ELECTION 2019: Have Justin Trudeau’s Liberals really cut middle-class taxes?

Conservative Andrew Scheer vows to cut bottom bracket, NDP’s Jagmeet Singh targets wealth tax

Most Read