A 1.5 kilometre stretch of of the Trans-Canada Highway eastbound through Revelstoke is being re-paved this week. The roadway was stripped on Monday and paving is supposed to take place from July 20 and ending July 23 between the hours of 7 p.m. to 7 a.m., the Ministry of Transportation said. The work caused traffic delays on Monday when the old surface was removed.